FOR PMs WHO RUN THEIR JOBS LIKE A CEO

You're the CEO of your project. Run it like one.

See cost code by cost code where you stand right now — not at closeout. That's where you get your margin back.

Build your scoreboard

Free to start. No credit card required.

EVERY PROJECT. TWO QUESTIONS.

1

Are you winning or losing?

Right now, cost code by cost code. Not at closeout when it's too late. Now, while you can still act.

2

Do you know why?

Which scopes are beating the estimate and which are bleeding. Which crews are productive and which need help. The why is where you get your margin back.

THREE STEPS

Load your budget. Send a link. See the truth.

01

Set up your job

Load cost codes and budgeted hours from the estimate. Five minutes. CSV import or manual entry.

02

Send your foreman a link

No app, no login, no passwords. They tap the link, enter hours and units, and hit submit. 60 seconds.

03

See where you stand

CPI, earned value, and projections update automatically. You know which jobs are winning, which aren’t, and why.

YOUR COMMAND CENTER

This is what your scoreboard looks like.

COST CODE CARDS

Three bars. One glance.

+
COST CODE CARDS

Three bars. One glance.

Underground3 cost codes
4010Install 4" Copper PipeInstalar tuberia de cobre de 4"
BUDGETED
360 hrs
USED
150 hrs
EARNED
180 hrs
CPI: 1.20Rate: 2.0 LF/hrProjected: 300 hrs
4015Insulation WrapAislamiento
BUDGETED
200 hrs
USED
140 hrs
EARNED
110 hrs
CPI: 0.79Rate: 1.4 LF/hrProjected: 253 hrs
4020Underground DrainageDrenaje subterraneo
BUDGETED
240 hrs
USED
280 hrs
EARNED
165 hrs
CPI: 0.59Rate: 1.1 LF/hrProjected: 407 hrs

Every cost code gets a card showing budgeted, used, and earned hours. Green means productive. Orange means watch it. Red means over budget.

DAILY LOG

Send a link. That's it.

+
DAILY LOG

Send a link. That's it.

DAILY PRODUCTION LOG
4010 Copper Pipe
HOURS
8
UNITS
120 LF
4015 Insulation
HOURS
4
UNITS
80 LF
4020 Drainage
HOURS
0
UNITS
0
SUBMIT LOG
No account required
14-DAY SUBMISSION PULSE
4010 Copper Pipe
4015 Insulation
4020 Drainage
7010 Hangers
WEEKENDS DIMMED

Send your foreman a link. No app, no login, no passwords. They enter hours and units in 60 seconds. You see it on your scoreboard before the next morning.

JOBSITE RADAR

Every job you run. One map.

+
JOBSITE RADAR

Every job you run. One map.

JOBSITE RADAR

Interactive 3D map in-app powered by Mapbox

See the health of every active project at a glance. Filter by super, client, or trade. As you close out jobs, the map becomes your track record. Your resume as a PM, built automatically.

CHANGE ORDERS

See where the budget really stands.

+
CHANGE ORDERS

See where the budget really stands.

J-000001Memorial Hospital Phase 2
BUDGET BREAKDOWN
820 hrs
+220
+160
Original BudgetApproved COsProceed at Risk
RECENT CHANGE ORDERS
CO-001Add fire suppression to wing B+120 hrsAPPROVED
CO-002Relocate main feed per architect RFI+100 hrsAPPROVED
CO-003Emergency generator hookup+160 hrsPROCEED AT RISK
TOTAL BUDGET
1,200 hrs(820 original + 380 COs)

3-step approval workflow with proceed-at-risk tracking

Every budget change has a name, an approver, and a timestamp. See original budget vs approved COs vs at-risk. Full audit trail.

THE MATH

What does 1% better look like?

The average labor-intensive contractor spends 30–40% of every dollar of revenue on labor. That means a small improvement in productivity has an outsized impact on your bottom line.

ANNUAL REVENUE$100M
$1M$500M
LABOR AS % OF REVENUE35%
20%60%

TOTAL LABOR SPEND

$35,000,000

A 1% IMPROVEMENT IN LABOR PRODUCTIVITY SAVES

$350,000

per year

The ability to improve performance starts with visibility. Join now to get 1% better.

Get 1% Better
BUILD YOUR SCOREBOARD